SIX RECORDINGS · EVIDENCE LIMITS MADE EXPLICIT
Coverage & chronology
3h 53m 45.75s of video timelines. 1,406 sampled frames across 61 contact sheets reviewed, plus focused source frames. Full generated transcripts reviewed. This is systematic 10-second visual sampling, not continuous frame-by-frame viewing or independent listening to every word.
R4 has a largely silent middle and audio ends about 60.6 seconds before its video. Its later interface sequence is visual evidence; no missing spoken decisions are invented.
Read full methodology, chronology and limitations · Local verification
Recording 1
- 00:00–08:00 — Discovery, one creation entry, Initiative naming, tagline, park card summary, domains and meaningful banner.
- 08:00–24:00 — Duna identity, separate art, focused popup, adopted policies, ecosystem footer, separate actual balances.
- 24:00–39:00 — Backing and notification choices; final shared list/detail toggle replaces earlier leave-confirmation idea.
- 39:00–48:00 — Classification and nested cycles, actionable activity feed, Save / Explore / Join, dependency records.
- 48:00–54:43 — Step-by-step copy, evidence guidance, own versus others’ work; unrelated phone interruption at end excluded.
Recording 2
- 00:00–14:00 — Own evidence actions and actual review results; step terminology and statuses.
- 14:00–26:00 — Orientation brief, external guides, source geography versus local instance; activity chat controls.
- 26:00–43:00 — Blanket account warning, back/scroll context, chips, progress ending, agent picker.
- 43:00–59:00 — Envoy reply expectations, quoted text, keyboard dismissal, switcher and retained close/reopen.
- 59:00–69:00 — Place/time context, location discovery, timeout followed by recovery; Home/Current independence.
- 69:00–80:15 — Home input and summary, 9:41 ambiguity, empty nearby state, next activity; unrelated end interruption excluded.
Recording 3
- 00:00–10:00 — Personal Agent progress, unknown versus zero, commitments and required tools.
- 10:00–20:00 — Financial snapshot records, organizer participation, real next actions and food-quality work.
- 20:00–25:30 — Conflicting school/source evidence, returned work and acceptance affordance, authority.
- 25:30–34:00 — Creation framing and separate enterprise-funding discussion; draft stays private.
- 34:00–43:00 — Dog-waste idea, automatic Home scope, search/research updates, local assumptions and unknowns.
- 43:00–50:30 — Answers, roles, repeated validation failure, resume/retry, cost hearsay and inability to start another.
- 50:30–55:30 — Exports, tool requirements, observed Google warning and connection wording.
- 55:30–59:35 — Luminary candidates, communication channels, agreed help records and final navigation.
Recording 4
- 00:00–02:00 — Stuck creation, attempt to start another, asking Ki to repair the existing draft.
- 02:00–04:00 — Ki reports unresolved validation; discovery/retry and captured reference image.
- 04:00–08:00 — Attaching original reference through file picker and chat; unrelated file content excluded.
- 08:00–10:00 — Original intent retained in chat; repeated repair/fresh-start suggestions and failures.
- 10:00–13:16 — Generic preparation/checklist receipts, fresh-start text, directory detour and retry. Brief unrelated Facebook screen excluded.
Recording 5
- 00:00–03:00 — Previously failed draft succeeds; multiple drafts, tentative creator backing exception, Create before adequate review, typography.
- 03:00–06:00 — Collection plan, ordering, initiative-member-scoped final-say roles.
- 06:00–09:00 — Canonical activity navigation and participation state divergence between list/detail.
- 09:00–12:00 — Notifications and actual school-board review; online veterans idea incorrectly receives local Home scope.
- 12:00–16:45 — Research questions: sponsor, scale, qualified partner and tools should become initial setup activities; tentative recording/privacy discussion.
- 16:45–19:43 — Waiting through draft preparation, validation repairs, then ready draft.
Recording 6
- 00:00–01:30 — Recap setup questions as activities and Luminary recruitment; draft opens into tools, no obvious editing.
- 01:30–03:30 — Ask Ki to revise; assistant says same draft and explicit Create, but that is a stated capability rather than tested persistence.
- 03:30–04:40 — Section/activity context into Ki; dependency cards and loading detour.
- 04:40–06:11 — Simple summary, ordered outline, Add activity and Edit activity; retain context.
Every register entry separates the comment reference from the decoded image timestamp. Broad privacy redactions preserve the surrounding screen where possible. Unredacted working transcripts and unrelated interruptions are excluded from the ZIP.