ENGINEERING HANDOFF · 2026.10.26.1

← Kit contents · Download Markdown ↓

Decisions and unresolved inputs

Current decisions reflected in the prototype

Use Initiative/flag; contextual Create; DUNA → Initiative → Activity → Action; new Lunchbreakers headers and copy; scoped collections; Claim Activity; four addressable DUNA tabs; proposed Policy label; synthetic USD/KI reporting; reversible local membership and backing. Keep old routes and source evidence.

Required implementation decisions

ID Needed input What it blocks
ARC-01 Exact current Ki and Ally system prompts, model adapters and run traces Accurate current-to-target implementation map.
ARC-02 Router selection, confidence, fallback, timeout and reroute budget Deterministic recovery from ambiguous and looping routing.
ARC-03 Scout/Guide taxonomy migration and restricted Mask/member mapping Safe routing across old role records.
ARC-04 Skill/version resolution, inheritance and Vibes runtime behavior Repeatable six-attribute configuration.
ARC-05 Canonical Activity instance key: location, time, group, scope, template version Duplicate prevention and reuse of completed work.
ARC-06 Dual review thresholds, independent reviewers, conflicts and DUNA Mage authority Valid review escalation and closure.
ARC-07 Activity remix semantics and accepted-work migration Branching beyond the current Initiative remix.
ARC-08 External-tool readiness and time-based workflow test results Publication/execution gates for those workflows.
GOV-01 Actual adopted DUNA policy, electorate, rule, calendar and timezone Binding decisions and scheduling.
GOV-02 Contribution distribution formula, accepted-obligation treatment, custody, signers and asset identity Authorized financial execution.
SITE-01 App commit/build IDs and evidence for reported completion Independent acceptance of the 71 reported entries.
MAP-01 Dev deployment of 52 updated and 34 new maps Close the one explicitly in-progress report item.

Apple App Review and Google OAuth status checks are completed activities in the report; approval outcomes were not supplied. Web-vault and wallet QA are reported test passes, not evidence that this static prototype moves funds. Public DUNA domains and Kiduna Studio remain separate future surfaces.

The Governance reconciliation retains its own detailed adoption, credit, privacy and custody decisions. The October 22 decision record is preserved for history; the current release notes specify which presentation decisions supersede it.